Indian Railway main logo Welcome to Indian Railways
Search :  
Increase Font size Normal Font Decrease Font size
View Content in Hindi
National Emblem of India

About Us

News & Recruitment Info

Tenders

Passenger Info

Contact Us



Goto Yahoo!!


 
Bookmark Mail this page Print this page
QUICK LINKS
All Active CPP Tenders
DivisionDepartmentTender Ref. No.Tender Opening DateName Of Work
Northern Railway HQConstruction18-S/1/14-15/Track/Tender dated 18.7.14 25-08-2014 Fabrication and supply of Glued joints 52 kg and 60 kg ii. Manufacture and supply of 1in12 turnout sleepers as per drawing NO.T 4732
 

Northern Railway HQEngineering211- 2380- 2013- 14-NR 25-08-2014 Fabrication & supply of 11200mm curved switches with Zu-1-60/60E1A1 thick web 880 grade tongue rails in accordance with RDSOâ??s standard drawing No.T-7076
 

Northern Railway HQEngineering211- 2390- 2013- 14-NR 25-08-2014 Fab. & Supply of: (i) Improved Switch Expansion Joints with fittings for long welded rail (with 80 mm max. gap) to RDSO Drg. No. T-6902 for BG 60kg (UIC) on PSC Sleepers complete with fittings (excluding GRSPs). (ii) Improved Switch Expansion Joints with fittings for long welded rail (with 65mm max. gap) to RDSO Drg. No. T-6922 for BG 60kg (UIC) on PSC Sleepers complete with fittings (excluding GRSPs).
 

AmbalaCommercial23-AC-393-UMB/POLICY CS-CAR PARKING-PART-II 25-08-2014 Publications of Tender Notice for Cycle Stand Parking at Chandigarh / 2nd Entry , Bathinda (2nd Entry) , Sirhind Abohar, Una Himachal, Sunam, Barnala, Malout, Rampuraphul, Gidderbaha, Roop Nagar, Barara (DN Side) , Anandpur Sahib, Nangaldam, Jagadhri Workshop, Ghanauli, Lehragaga, Dhulkot, Tapa, Amb Andaura, Car Parking, at Chandigarh (2nd Entry) Chandigarh (Main Gate), Jagadhri, Patiala, Sangrur, Railway Station
 
Document Available
Corrigendum Available
MoradabadCommercial3/Pub/MB Div/2014-15:2 Dated : 25-08-14 25-08-2014 (1)Commercial Publicity Contract to display advertisement at stations Circulating area and Platform at Hardoi. (2)Commercial Publicity Contract to display advertisements inside the coaches of Jan Shatabdi train (12055/57 & 12056/58) IInd rake.
 
Document Available
MoradabadSignal and Telecom23(RT)/Tele/Dismantling/CH-BE/2014-15 25-08-2014 Dismantling of Over Head alignment and its accessories in MB-CH-BE section and part of released material submission to Aalam Bag Store.
 
Document Available
MoradabadElectricalTender Notice No-07/2014 25-08-2014 (1)Repairing/Rewinding of 33/11 kV, 3 MVA Transformer at Bareilly. (2)Supply, fixing, testing and commissioning of retro-fitment of LED lights in place of existing 18/20 watt fluorescent tube light in 100 nos. Non-AC coaches of train lighting depot over Moradabad Division. (3)Operation and Annual Maintenance Contract (AMC) for Three Years of 33/11 KV, 11/0.415 KV Sub Station at line par and pump no. 4 Town Supply-West at Moradabad.
 
Document Available
Corrigendum Available
Northern Railway HQEngineering32-W/Met/Br.no1268 & 21 /MB/BL/TKJ/13-14 dt.18.07.2014 25-08-2014 Metalizing work on Br.no.1268 & 21 on MB-SRE section & LRJ-DDN section respectively of Moradabad Division,under AXEN/BL/MB
 
Document Available
Northern Railway HQSignal and TelecomSWG/GZB/22-Sig/P/14-15 25-08-2014 Road contract for hiring of LP Model Truck of 9 MT capacity for distribution /collection of N.Rly. materials from Signal Workshop, GZB to various indentors and vis a vis in the jurisdiction of N.Rly. & other Rly.etc.
 
Document Available
DelhiEngineering128-W/269/OT/14-15/WE/NIT -13-A 26-08-2014 Repair to plastering, flooring, draining, kitchen, toilet & allied work in connection with shifting at S.M.Marg Rly. Colony & Moti Bagh bunglows in the section of SSE/W/San Martin under ADEN/E-II
 
Document Available
DelhiEngineering128-W/269/OT/14-15/WE/NIT -13-B 26-08-2014 Replacement of damaged wooden cup boards, improvement to water supply and allied work in Type-V bunglow at San Martin Marg in the section of SSE/W/SMM under ADEN/E-II
 
Document Available
DelhiEngineering128-W/269/OT/14-15/WE/NIT -13-C 26-08-2014 Replacement of damaged wooden cub board, improvement to water supply and allied work bunglows in San Martin Marg and Member bunglows in Moti Bagh in the section of SSE/W/SMM under ADEN/E-II.
 
Document Available
Northern Railway HQConstruction17-Elect./DYCEE/C/NDLS/GT/01 26-08-2014 Electrification of balance quarters, service buildings, station buildings, platforms including11/0.415 KV outdoor type HT sub-stations with D.G. sets along with associated works in connection with new line between Jind- Sonipat and electrification of quarters at Panipat & Khukrana including rewiring of construction offices, rest houses & quarters at Bhatinda.
 
Document Available
DelhiEngineering128-W-280- NIT-6/14-15-W-V 26-08-2014 Construction of 10.45 Km fencing to prevent encroachment on TKD-PWL section
 
Document Available
LucknowMechanical85-M/Works/LWP/2013-14 26-08-2014 Provision of Porta Cabin Rolling Huts with Electrical fittings at C&W depot Faizabad.
 
Document Available
Corrigendum Available
AmbalaElectrical30-Elect/ TRD/ UMB/ T-04/2014- 15 26-08-2014 Oliver G system for branch line current collection.
 
Document Available
Northern Railway HQEngineeringA-26-P-90-14-TMC 27-08-2014 Pinion for CSM. Coupling for Tamping Unit. Pressure Disc. Tamping Arm Axle (Bolt) for Tamping Unit for Unimat.
 

Northern Railway HQConstruction1-w/Tender/172/Dy/CE/C/MB dated 23.7.14 27-08-2014 Soil Investigation, casting of test pile, initial load test, Plate load test, design and drawing of foundation, Sub structure and super structure for various ROBâ??s under the jurisdiction of Deputy Chief Engineer/ Construction, Moradabad of Moradabad division.
 
Document Available
Northern Railway HQConstruction1-w/Tender-172/Dy/CE/C/MB dated 23.7.14 27-08-2014 Soil Investigation, casting of test pile, initial load test, Plate load test, design and drawing of foundation, Sub structure and super structure for various ROBâ??s under the jurisdiction of Deputy Chief Engineer/ Construction, Moradabad of Moradabad division.
 

Northern Railway HQConstruction1-W/Tender 173 Dy/CE/C/MB dated 23.7.14 27-08-2014 AT welding of Rail Joints Using Railway portion on 90R/52 kg/60 kg new/SH single/ Multiple rail panels in yards// block section on main/loop lines with compressed air petrol preheating with automatic thimble technology in c/with â??Development of facilities for running 18 coaches train between HW-DDN sectionâ? and â??Provision of additional directional loops at 17 stations between Lucknow- Moradabad- Saharanpur section of Moradabad Divisionâ? and other allied work in the jurisdiction of DY/CE/C/MB
 
Document Available
1 - 20  Of  (208)                 1   2   3   4   5   6   7   8   9   10   11   Next   Last



  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2010  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.